Assembly phased

A. BASIC PANEL INSTALLATION
B. INSTALLATION OF TEMINAL PANELS
C. FIXING OF THE MONOLITHIC SILL WITH ASSEMBLED CORNER
D. GROUT LINES SEALING

C. FIXING OF THE MONOLITHIC SILL WITH ASSEMBLED CORNER

When the panel must be cut on the kert line:


Make the Kerf cut on the edge of the panel (see processings section)


After fixing the panel insert the kerf plate


Insert previously realized assembled corner fixing it with structural silicone.


Insert the spacers for the grout lines