Assembly phased

A. BASIC PANEL INSTALLATION
B. INSTALLATION OF TEMINAL PANELS
C. FIXING OF THE MONOLITHIC SILL WITH ASSEMBLED CORNER
D. GROUT LINES SEALING

B. INSTALLATION OF TEMINAL PANELS

When the panel must be cut on the Kerf side:


Position the bracket flush with the panel and 5 cm (2”) from the side edge


The brackets must have a minimum pace of 70 cm - 27”


Drill using a 5 mm steel bit in correspondence of the 4 holes


Insert the rivets and tighten the bracket